Speed to Power
Bridge power in 120 days. Permanent generation in modular blocks within about a year.
200+ MW hyperscaler bridge program
Behind-the-meter power for AI and data centers
From first power to permanent baseload — one accountable partner.
One counterparty · No re-contracting · Nothing strands


Why NeoCore
Ten years supplying fuel and natural gas feedstocks to the most demanding operators in the Permian. Building and refining our engineering and power-solutions platform, with reference customers in execution.
Bridge power in 120 days. Permanent generation in modular blocks within about a year.
200+ MW hyperscaler bridge program
One of the largest CNG virtual pipeline fleets in Texas, backed by our own compression and diesel logistics.
Firm supply · firm transport · CNG backup
24/7 field operations. Permian-based, national footprint. Expanding to where our customers build.
National reach · 24/7 operations
Solutions
Delivered by NeoCore Power with our affiliates CORE Natural Gas and Manticore Fuels — one contract, one counterparty. Specialist partners for EPC, cooling, storage and data halls.

NeoCore Power
First block in 9–12 months
3–15 MW modules stacked into 50–300 MW power islands

CORE Natural Gas
Gas in weeks
Within ~200 miles of our Permian compression

Manticore Fuels
As little as 120 days
Contract signing to generators running
Timing indicative and site-dependent.
Scale and speed
Tell us the megawatts and the date. This is how we get there at each scale.
| Dimension | Starter · 25–75 MW | Mid-scale · 100–200 MW | Large campus · 300 MW+ |
|---|---|---|---|
| What we deploy | Portable diesel gensets for first power; gas recips for the permanent block | 3–15 MW gas modules stacked into power islands, with BESS for firm uptime | Aero and industrial gas turbines plus recips in power islands, with BESS |
| Fuel path | Diesel bridge, CNG virtual pipeline | CNG until the lateral is in service; pipeline gas after | Pipeline gas on firm transport; CNG as backup |
| Permitting path | Portable-unit route for bridge power | Air permit, ~6-month minimum | Air permit and emissions plan, including non-attainment zones |
| Bridge power | ≤120 days, where required | ≤120 days, where required | ≤120 days for an initial block, where required |
| Permanent power | First block in ~9–12 months | First block in ~9–12 months | First block in ~9–12 months, then phased blocks |
Ranges indicative. Permits, gas access and offtake terms set each schedule, confirmed in Phase I.
Track record
Not just a menu of services: a decade of fuel and natural gas operations for the most demanding operators in the Permian.
Acquired and optimized the largest U.S. transmix refinery
Built Manticore to fuel Permian frac fleets
Launched the market-leading CORE automated fueling system
Expanded into CNG virtual pipeline and compression
Launched NeoCore Power for behind-the-meter generation
largest oil and gas operators served
of Permian oil production supported
of U.S. oil production enabled, about one in every ten barrels
platform revenue since 2018
of power deployments in design and contracting
Active programs
Speed to energization drives the decision. We are delivering against it today — from hyperscale bridge fuel to enterprise-class behind-the-meter design.
| Client | Solution | Scale | Location | Status |
|---|---|---|---|---|
| Tier-1 hyperscaler | Diesel bridge fuel and custom automated fueling for speed-to-power generation | 200+ MW; 384 generators; custom fueling system with 99.5% uptime availability | West Texas | Contracted — mobilizing |
| National power generation equipment provider | Preferred fueling partner — diesel and CNG — across its generation fleet | National; hyperscale is first deployment | United States | Partnership in place |
| Multi-GW digital-infrastructure operator | True BTM: we own fuel supply and generation; islanded at start, moving to grid-parallel for added capacity | Multiple sites × ~200 MW | Permian Basin, TX | Solution design — award pending |
Program details withheld under confidentiality obligations; references available under NDA where permitted.
How we deliver
Phases can overlap; a bridge can run in parallel with design.
Share your load, location, required date and availability target. An indicative plan follows within one week of our technical exchange.