Track Record

Built on a decade of
24/7 energy operations.

Not just a service menu: a decade of 24/7 fuel and natural gas operations for the most demanding operators in the Permian — the operating base behind NeoCore Power.

  1. 2016

    Acquired and optimized the largest U.S. transmix refinery

  2. 2018

    Built Manticore to fuel Permian frac fleets

  3. 2019

    Launched the market-leading CORE automated fueling system

  4. 2021

    Expanded into CNG virtual pipeline and compression

  5. 2026

    Launched NeoCore Power for behind-the-meter generation

8 of 10

largest oil and gas operators served

20–25%

of Permian oil production supported

~10%

of U.S. oil production enabled, about one in every ten barrels

$1.5B+

platform revenue since 2018

~1 GW

of power deployments in design and contracting

Active programs

Active across hyperscale, neocloud and digital infrastructure.

Speed to energization drives the decision. We are delivering against it today.

ClientSolutionScaleLocationStatus
Tier-1 hyperscalerDiesel bridge fuel and custom automated fueling for speed-to-power generation200+ MW; 384 generators; custom fueling system with 99.5% uptime availabilityWest TexasContracted — mobilizing
National power generation equipment providerPreferred fueling partner — diesel and CNG — across its generation fleetNational; hyperscale is first deploymentUnited StatesPartnership in place
Multi-GW digital-infrastructure operatorTrue BTM: we own fuel supply and generation; islanded at start, moving to grid-parallel for added capacityMultiple sites × ~200 MWPermian Basin, TXSolution design — award pending
Bitcoin miner pivoting to AI (~150 MW operating)BTM generation to supplement grid capacity; islanded at start, moving to grid-parallelSite-specificWest TexasUnder NDA — diligence
NeoCore Stanton campusOwned power campus alongside our compression and gas supply, for private and sovereign AI tenants seeking cost-effective power below 99.9% availability—Stanton, TXBuild-out underway

Program details withheld under confidentiality obligations; references available under NDA where permitted.

Case study · Tier-1 hyperscaler

200+ MW of bridge power, fueled and automated at hyperscale.

At a glance

Client
Tier-1 hyperscaler
Scale
200+ MW; 384 × 600 kVA generators
Volume
75M+ gallons of diesel per year
Term
One year, plus extension options
Model
With a national power generation equipment provider
Status
Mobilizing

Challenge

  • Energize compute in weeks, not the years a grid connection takes
  • Hundreds of portable generators, each needing continuous fuel
  • Zero tolerance for interruption

Solution

  • Custom automated fueling loop across all 384 generators
  • Designed, built and PLC/SCADA-programmed in-house
  • Full diesel supply, 24/7 technicians, dispatch and staged reserves

Outcome

  • Construction and IT load powered ahead of permanent infrastructure
  • One operating scope, one SLA
  • Template for a multi-GW national rollout

Program path

  1. Stage 1Construction powerInitial generator set-up and wet-nozzle fueling
  2. Stage 2200+ MW IT-load bridgeAutomated loop fuels the full fleet 24/7
  3. PlannedTransition to gasCNG or pipeline gas, then permanent generation

Speed: first introduction to contracted program in about two months.

Volumes are forecasts; program details subject to work orders.

Case study · AI data center operator

Four 200 MW behind-the-meter plants, engineered to enterprise-class specifications.

ItemSite ASite BSite CSite D
Program200 MW net200 MW net200 MW net200 MW net
GridSubstation adjacentUtility substation adjacentUnder evaluationLayout in progress
FuelResidue gasGathering gas (treatment)Residue gasUnder evaluation
Gas pathwayLateral requiredStrongStrongestUnder evaluation

Key finding

The constraint is not gas supply, it is firm taps, laterals and firm transport. That insight re-ranked the sites and focused engineering on pathways that can be locked in. Each site requires ~40–45 MMscf/d of firm gas at full load.

Phase I · Strategic assessmentDelivered
  • Pipeline and residue-gas mapping across candidate sites
  • Gas sampling, composition, tie-in and pressure work with midstream operators
  • Parallel delivered-to-the-fence gas pathways
Phase II · Detailed designUnderway
  • Enterprise-class specification
  • Islanded at start; grid-parallel ERCOT tie-in for added capacity
  • Tier-1 owner’s engineer engaged; phased design delivery
Phase III+ · Build, own, operateNext
  • Phased generation blocks against the customer’s ramp
  • NeoCore owns the fuel supply and generation under long-term offtake

Client and site identities withheld. Program in design and proposal phase. Figures are design-basis estimates.

The team behind it

A proven team, working together for eight years.

Backed by a power engineering and field team from Honeywell, Siemens, Caterpillar, Raytheon and Halliburton.

Let’s energize your site.

Share your load, location, required date and availability target. An indicative plan follows within one week of our technical exchange.