Fuel Infrastructure
Fuel certainty is
power certainty.
Generation is only as reliable as the gas behind it. We engineer the fuel path first.


What we secure for your site
- Firm transportation and firm supply agreements sized to your load and uptime target
- Taps, laterals and interconnects engineered with the pipeline operator
- Gas sampling, composition and pressure studies before design is fixed
- Redundant fuel paths: pipeline gas with our own CNG virtual pipeline as backup
- Waha-indexed supply, with fuel passed through at cost
Why it matters for uptime
Firm supply, firm transport and a CNG backup, so availability is designed in, not hoped for.
Midstream partners
We work with the operators that move Permian gas.
We have worked with midstream operators on gas supply, interconnects and firm-transport pathways — and we engineer the fuel path with the pipeline operator before design is fixed.
Key finding from our multi-site design work
The constraint is not gas supply, it is firm taps, laterals and firm transport. That insight re-ranks sites and focuses engineering on pathways that can be locked in.
CNG virtual pipeline
Gas before the lateral. Backup after it.
One of the largest CNG virtual pipeline fleets in Texas, backed by our own compression and diesel logistics.

- Gas in weeks, within ~200 miles of our Permian compression
- Primary supply until the lateral is in service; backup after
- On-site pressure regulation and automated fueling
- Beyond ~200 miles: a diesel bridge
Let’s energize your site.
Share your load, location, required date and availability target. An indicative plan follows within one week of our technical exchange.
