Scale, Speed & Equipment
Sized to your load
and your date.
Tell us the megawatts and the date. This is how we get there at each scale.
| Dimension | Starter · 25–75 MW | Mid-scale · 100–200 MW | Large campus · 300 MW+ |
|---|---|---|---|
| What we deploy | Portable diesel gensets for first power; gas recips for the permanent block | 3–15 MW gas modules stacked into power islands, with BESS for firm uptime | Aero and industrial gas turbines plus recips in power islands, with BESS |
| Fuel path | Diesel bridge, CNG virtual pipeline | CNG until the lateral is in service; pipeline gas after | Pipeline gas on firm transport; CNG as backup |
| Permitting path | Portable-unit route for bridge power | Air permit, ~6-month minimum | Air permit and emissions plan, including non-attainment zones |
| Bridge power | ≤120 days, where required | ≤120 days, where required | ≤120 days for an initial block, where required |
| Permanent power | First block in ~9–12 months | First block in ~9–12 months | First block in ~9–12 months, then phased blocks |
Ranges indicative. Permits, gas access and offtake terms set each schedule, confirmed in Phase I.
Worked example
A 50 MW need: what is on site, and when.
A 50 MW requirement sits in our starter range (25–75 MW): portable diesel gensets for first power, gas reciprocating engines for the permanent block, fueled by diesel bridge and CNG virtual pipeline.
- DaysTechnical exchange and Stanton site visit
- 2–4 weeksStrategic assessment and bridge plan
- 4–6 weeksGeneration term sheet
- ≤120 daysBridge power running, where required — portable diesel gensets on the portable-unit permitting route
- ~9–12 monthsFirst permanent capacity block: gas reciprocating engines
- ThenThe bridge steps down block by block as permanent power arrives
How we source equipment
We confirm the equipment before we commit a date.
Generation is sourced through every channel that can meet the date — and integrated by our engineers.
gas turbine capacity identified
units, 5 to 40 MW each
GE · Siemens · Solar Turbines · Baker Hughes · Hitachi
delivery windows
Rebuilt and refurbished units
Broker networks
Equipment you supply, integrated by us
Equipment figures from our September 2026 equipment book; capacity indicative and includes reserved new-build slots.
Let’s energize your site.
Share your load, location, required date and availability target. An indicative plan follows within one week of our technical exchange.