Scale, Speed & Equipment

Sized to your load
and your date.

Tell us the megawatts and the date. This is how we get there at each scale.

DimensionStarter · 25–75 MWMid-scale · 100–200 MWLarge campus · 300 MW+
What we deployPortable diesel gensets for first power; gas recips for the permanent block3–15 MW gas modules stacked into power islands, with BESS for firm uptimeAero and industrial gas turbines plus recips in power islands, with BESS
Fuel pathDiesel bridge, CNG virtual pipelineCNG until the lateral is in service; pipeline gas afterPipeline gas on firm transport; CNG as backup
Permitting pathPortable-unit route for bridge powerAir permit, ~6-month minimumAir permit and emissions plan, including non-attainment zones
Bridge power≤120 days, where required≤120 days, where required≤120 days for an initial block, where required
Permanent powerFirst block in ~9–12 monthsFirst block in ~9–12 monthsFirst block in ~9–12 months, then phased blocks

Ranges indicative. Permits, gas access and offtake terms set each schedule, confirmed in Phase I.

Worked example

A 50 MW need: what is on site, and when.

A 50 MW requirement sits in our starter range (25–75 MW): portable diesel gensets for first power, gas reciprocating engines for the permanent block, fueled by diesel bridge and CNG virtual pipeline.

  1. DaysTechnical exchange and Stanton site visit
  2. 2–4 weeksStrategic assessment and bridge plan
  3. 4–6 weeksGeneration term sheet
  4. ≤120 daysBridge power running, where required — portable diesel gensets on the portable-unit permitting route
  5. ~9–12 monthsFirst permanent capacity block: gas reciprocating engines
  6. ThenThe bridge steps down block by block as permanent power arrives

How we source equipment

We confirm the equipment before we commit a date.

Generation is sourced through every channel that can meet the date — and integrated by our engineers.

~1.5 GW+

gas turbine capacity identified

120+

units, 5 to 40 MW each

5 OEMs

GE · Siemens · Solar Turbines · Baker Hughes · Hitachi

Now–2029

delivery windows

01

New-build production slots

02

Rebuilt and refurbished units

03

Broker networks

04

Equipment you supply, integrated by us

Equipment figures from our September 2026 equipment book; capacity indicative and includes reserved new-build slots.

Let’s energize your site.

Share your load, location, required date and availability target. An indicative plan follows within one week of our technical exchange.