For Site Owners and Developers

Turn a grid allocation
into powered land.

Buyers pay for energized land. Bridge power makes a site energized before the grid does.

  1. AllocationBatch Zero capacity allocated

    April 9 – June 8, 2027

  2. BridgeNeoCore power on site

    Weeks from notice to proceed; permanent gas generation in ~9–12 months

  3. GridTransmission capacity delivered

    2028–2032; loads not served in the window roll to 2033

Batch Zero dates per ERCOT PGRR145 / NPRR1325 and PUCT Docket 58481.

What we bring to a Batch Zero site

  • Bridge generation in 10–30 MW blocks, modular and redeployable as permanent capacity comes online
  • Bolt-on behind-the-meter capacity to expand beyond the grid allocation
  • Fuel path by geography: CNG within ~200 miles of our Permian compression; diesel bridge beyond
  • Emissions and air-permit pathway, including sites in non-attainment zones
  • A three-to-five-year primary bridge with a ten-year backup tail; the plant stays as backup when the grid arrives
  • One counterparty for fuel, generation and operations, structured to transfer to a successor owner

The window

Power is allocated in spring 2027. A site with committed bridge power in hand sells as powered land; a site without one waits for the grid.

Is your site a fit?

  • Distance to our gas supply
  • Pipeline adjacency
  • Acreage and target load
  • Allocation year sought
Screen My Site

Grid + BTM

More megawatts sooner, and a stronger exit.

Behind-the-meter capacity on top of your grid allocation, from the team behind our 200+ MW hyperscaler bridge program.

DimensionStarter · 25–75 MWMid-scale · 100–200 MWLarge campus · 300 MW+
What we deployPortable diesel gensets for first power; gas recips for the permanent block3–15 MW gas modules stacked into power islands, with BESS for firm uptimeAero and industrial gas turbines plus recips in power islands, with BESS
Fuel pathDiesel bridge, CNG virtual pipelineCNG until the lateral is in service; pipeline gas afterPipeline gas on firm transport; CNG as backup
Permitting pathPortable-unit route for bridge powerAir permit, ~6-month minimumAir permit and emissions plan, including non-attainment zones
Bridge power≤120 days, where required≤120 days, where required≤120 days for an initial block, where required
Permanent powerFirst block in ~9–12 monthsFirst block in ~9–12 monthsFirst block in ~9–12 months, then phased blocks

Let’s energize your site.

Share your load, location, required date and availability target. An indicative plan follows within one week of our technical exchange.

Start a Technical Exchange